The drift certificate

A one-step check you can afford, for when computing the whole functional is too expensive.

RES.99 September 2026developingworking position
hi‾(t+1)=hi^(t+1)−∑jLij[εj+ℓjνj]−Wi≥0
Start from the margin you expect. Subtract, for each relationship coefficient, how sensitive the constraint is to it multiplied by how wrong you might be plus how far it can drift while you are acting. Subtract a bound on everything else. If what is left is not negative, the next step is safe — the next step only.

The exact functional is expensive, so the paper derives a cheaper sufficient condition. Take the nominal predicted margin for a constraint, then subtract what the uncertainty could cost you: for each relationship coefficient, how sensitive the constraint is to it, multiplied by the current estimation error plus the drift it can accumulate during the latency. Then subtract a bound on everything else. If what remains is non-negative, the next step is safe.

Why latency is multiplied, not added

The drift term is the drift rate times the number of steps of sensor and actuator delay. That is the part worth noticing: a measurement is not wrong when it is taken, it becomes wrong while you are acting on it. Accuracy and freshness are separate properties, and a certificate that tracks only accuracy will certify a system that is about to fail.

What it does not give you

It is one step. Passing it does not prove safety over a horizon — for that, the certified successor states have to be shown to belong to a recursively established viable set. Treating a one-step certificate as a future guarantee is the most likely way to misuse this.

It is also sufficient and not necessary. Correlated uncertainties make it conservative, so a system can fail the check and still be safe.

The paper also reports a dimensionless ratio of margin to uncertainty cost, where a value of at least one is equivalent to passing the check. It is a diagnostic for reading off how much room is left. It is not a law, and the zero-denominator case has to be handled separately.